Hill Cutting & Excavation Process in Road Construction
1. Site Preparation & Marking
Conduct a detailed survey using Total Station or GPS to mark the centerline of the road.
Fix benchmarks, offset pegs, and slope limits on-site.
Clear vegetation, trees, and bushes in the working area.
2. Earthwork Planning
Prepare cutting profiles as per the road alignment and design.
Decide the cutting method: manual cutting, mechanical excavation, or controlled blasting (for rocky terrain).
Ensure slope stability with bench cutting (step-wise excavation).
3. Start of Excavation Work
Begin top-down excavation from the highest point of the hill along the alignment.
Use excavators (JCB, Poclain) and rock breakers for soft to medium-hard rock.
For hard rock, use controlled blasting with prior permission and safety precautions.
Excavate in benches (steps): usually 1.5–3 meters deep depending on slope design.
4. Slope Protection
Maintain safe slope ratios (e.g., 1:1.5 or as per design) to avoid collapse.
Construct retaining walls or crib walls for support if needed.
Install geotextiles or nets on loose soil slopes for erosion control.
5. Drainage Arrangement
Provide temporary side drains to divert rainwater and prevent erosion.
Plan for permanent culverts, catch water drains, and cross-drainage structures.
6. Muck Disposal
Collect and transport excavated soil (muck) to authorized dump yards.
Avoid dumping on slopes or into rivers to prevent landslides or environmental damage.
7. Safety & Monitoring
Barricade working zones and put up safety signs.
Workers must wear helmets, shoes, gloves, and other PPE.
Engineers and supervisors must monitor excavation depth, alignment, and safety compliance daily.
Видео New starting cutting work is very danger prossesing for Road work@civilsurveyingbappa3113 канала Civil & Surveying Bappa
1. Site Preparation & Marking
Conduct a detailed survey using Total Station or GPS to mark the centerline of the road.
Fix benchmarks, offset pegs, and slope limits on-site.
Clear vegetation, trees, and bushes in the working area.
2. Earthwork Planning
Prepare cutting profiles as per the road alignment and design.
Decide the cutting method: manual cutting, mechanical excavation, or controlled blasting (for rocky terrain).
Ensure slope stability with bench cutting (step-wise excavation).
3. Start of Excavation Work
Begin top-down excavation from the highest point of the hill along the alignment.
Use excavators (JCB, Poclain) and rock breakers for soft to medium-hard rock.
For hard rock, use controlled blasting with prior permission and safety precautions.
Excavate in benches (steps): usually 1.5–3 meters deep depending on slope design.
4. Slope Protection
Maintain safe slope ratios (e.g., 1:1.5 or as per design) to avoid collapse.
Construct retaining walls or crib walls for support if needed.
Install geotextiles or nets on loose soil slopes for erosion control.
5. Drainage Arrangement
Provide temporary side drains to divert rainwater and prevent erosion.
Plan for permanent culverts, catch water drains, and cross-drainage structures.
6. Muck Disposal
Collect and transport excavated soil (muck) to authorized dump yards.
Avoid dumping on slopes or into rivers to prevent landslides or environmental damage.
7. Safety & Monitoring
Barricade working zones and put up safety signs.
Workers must wear helmets, shoes, gloves, and other PPE.
Engineers and supervisors must monitor excavation depth, alignment, and safety compliance daily.