Загрузка страницы

Army Engineers Build Floating Bridge – Multi-Role Bridge Company

U.S. Army Engineers demonstrate their capabilities utilizing the Improved Ribbon Bridge (IRB).

The Improved Ribbon Bridge (IRB) enables Soldiers to cross rivers, lakes, or other bodies of water in the absence of a means of crossing or in the event of an unreliable or damaged permanent bridge. The IRB can be configured as either a continuous full-closure bridge or assembled and used for rafting operations.

AiirSource Military covers events and missions from the United States Armed Forces: Army, Navy, Marine Corps, Air Force, and Coast Guard.

Visit our channel for more military videos:
http://www.youtube.com/AiirSource

Like & share this video to show your support!
Subscribe to stay updated:
http://www.youtube.com/subscription_center?add_user=AiirSource

Facebook: http://www.facebook.com/AiirSource
Google+: http://www.google.com/+AiirSource
Twitter: http://www.twitter.com/AiirSource

Credits: Spc. Trace Lundberg

Видео Army Engineers Build Floating Bridge – Multi-Role Bridge Company канала AiirSource Military
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
25 августа 2016 г. 16:00:00
00:09:12
Яндекс.Метрика