Laying trenchless microducts for FTTH by using mole ploughing
Building a fiber optic based network?
Then you need to choose your platform of contracting. Fast or slow? Well, for faster deployment, especially out in open landscape mole ploughing is to be preferred.
A tractor with a specialized plow attachment that make quick work of installing pipe from GM Plast is displayed in this video
The mole plough powers through turf with minimal ground disturbance in rural area Denmark.
A high speed FTTH network for the benefit of the citizens in Hurup and surroundings
Thanks to the contractor:
https://da-dk.facebook.com/hedegaardredsted/
Thanks to the network owner:
https://www.thymors.dk/
Want to know more about GM Plast A/S?
gm@gm-plast.dk
www.gm-plast.dk
Видео Laying trenchless microducts for FTTH by using mole ploughing канала GM Plast A/S
Then you need to choose your platform of contracting. Fast or slow? Well, for faster deployment, especially out in open landscape mole ploughing is to be preferred.
A tractor with a specialized plow attachment that make quick work of installing pipe from GM Plast is displayed in this video
The mole plough powers through turf with minimal ground disturbance in rural area Denmark.
A high speed FTTH network for the benefit of the citizens in Hurup and surroundings
Thanks to the contractor:
https://da-dk.facebook.com/hedegaardredsted/
Thanks to the network owner:
https://www.thymors.dk/
Want to know more about GM Plast A/S?
gm@gm-plast.dk
www.gm-plast.dk
Видео Laying trenchless microducts for FTTH by using mole ploughing канала GM Plast A/S
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Fiberblowing cable into microduct: GM Plast A/Secontech Kabelpflug München Leerrohrverlegung - econtech cable plough Huddig - MunichInstalling conduit for fiber to your home with a Vibratory PlowReaching rural areas with high speed broadband, in this case FTTHCable ploughing in snowy conditions with HUDDIG 1260C Muddy MaryGravel Mole Drainer from O'Keeffe Engineering Newmarket Co CorkMole plough setup in a dry yearBrowns Subsoiler Moledrainer 2013 pulled with Ford 7740"Mole" helps Connecting ShropshirePanks Irrigation With Their new Vermeer ptx40County plow opening drifted shut road in Randolph County, INTractors At Work | PloughingSiromer pipe layerFiber optic cable deployment along railroadDaken Single Tyne RippersBlowing Fibre Optic Bundle With A Fremco NanoflowMicrotrenching mit dem CF-6020 MT in KapstadtHeavy Duty Single Tyne SubsoilerFiber Distribution Hub FDH 4000 Vault InstallationFTTH contracting: Unforeseen events may occur, also in the perfect world. Lawn mowing included