Загрузка страницы

Time-Lapse Example: 36hr Road Bridge Demolition & Replacement

This was a time-lapse project commissioned by Network Rail and Carillion. We captured the demolition and installation of a road bridge near Romsey in Hampshire.

36hrs condensed into 5.5 minutes.

The project was filmed by two static time-lapse cameras. One was attached to a small gantry overlooking the rail track and the other was positioned at ground level.

An Ainscough crane was hired to do the construction. It had a lifting capacity of 1,250 tonnes.

Видео Time-Lapse Example: 36hr Road Bridge Demolition & Replacement канала HeavyDutyTimeLapse
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
1 июня 2012 г. 21:48:44
00:05:49
Яндекс.Метрика