Company Hutní Montáže - Histroy of the company - Assembly of the steel structure of the bridge
ECHNICAL PARAMETERS
🔧 Weight of the bridge structure: 5200 tons
🔧 Length of the main arch: 231 m
🔧 Total section of the steel part of the bridge: 517 m
🔧 Width: 32 m
CONTACT
Director of the division of assembly of steel structures and bridges
E-mail: petr.brazda@hutni-montaze.com Mobile: +420 595 95 4074
#engineering #manufacturing #design #equipment #technology #manufacturing #bridge
Видео Company Hutní Montáže - Histroy of the company - Assembly of the steel structure of the bridge канала WITKOWITZ
🔧 Weight of the bridge structure: 5200 tons
🔧 Length of the main arch: 231 m
🔧 Total section of the steel part of the bridge: 517 m
🔧 Width: 32 m
CONTACT
Director of the division of assembly of steel structures and bridges
E-mail: petr.brazda@hutni-montaze.com Mobile: +420 595 95 4074
#engineering #manufacturing #design #equipment #technology #manufacturing #bridge
Видео Company Hutní Montáže - Histroy of the company - Assembly of the steel structure of the bridge канала WITKOWITZ
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![Company HUTNÍ MONTÁŽE - Crane HM 1000](https://i.ytimg.com/vi/EgUU0vvvQAA/default.jpg)
![Company VÍTKOVICE HAMMERING - Presentation of company](https://i.ytimg.com/vi/2Ez5wRmO17Y/default.jpg)
![Company WITKOWITZ](https://i.ytimg.com/vi/vyX3GpTTwu4/default.jpg)
![Company Hutní montáže, a.s. - Duisburg bridge A40 before completion in Germany](https://i.ytimg.com/vi/XT3jd1oq1A8/default.jpg)
![Ochutnávka ze záznamu akce představení loga](https://i.ytimg.com/vi/TUaCjfc8KRU/default.jpg)
![Company Hutní montáže, a.s. - Mariánský most](https://i.ytimg.com/vi/HNSOEqhKfUk/default.jpg)
![Company HUTNÍ MONTÁŽE - Žďákovský bridge](https://i.ytimg.com/vi/KWuyDMV8s7w/default.jpg)
![Company HUTNÍ MONTÁŽE - Bridge SNP in Bratislava](https://i.ytimg.com/vi/PuMDM8uudJc/default.jpg)
![Company HUTNÍ MONTÁŽE - Crane Demag CC2800](https://i.ytimg.com/vi/mF_gTvEp19Y/default.jpg)
![Company WITKOWITZ](https://i.ytimg.com/vi/FmERLXe_2x0/default.jpg)
![Company HUTNÍ MONTÁŽE & ZO OS KOVO HM - OPEN DAY - 1.5.2022](https://i.ytimg.com/vi/Elg1wI6ZqyQ/default.jpg)
![Company Hutní montáže, a.s. - Crane Demag CC2800](https://i.ytimg.com/vi/0btcbOQDQVQ/default.jpg)
![Company Gearworks - Business Strategy](https://i.ytimg.com/vi/kAvR7LdRJNQ/default.jpg)
![Company Hutní Montáže & Noen - Bucket Wheel Excavator KK 1600](https://i.ytimg.com/vi/IdNRCMj6CSk/default.jpg)
![WITKOWITZ - Project Reactor VR 2](https://i.ytimg.com/vi/IQFW_tybay8/default.jpg)
![Company HUTNÍ MONTÁŽE - Bridge in Karviná](https://i.ytimg.com/vi/7zos7YT6uzI/default.jpg)
![Company Gearwoks - TEST of lamella](https://i.ytimg.com/vi/jYBT_tLPz-I/default.jpg)
![Company HUTNÍ MONTÁŽE & ZO OS KOVO HM - OPEN DAY 5/2022](https://i.ytimg.com/vi/3QhAhHqIYMA/default.jpg)
![HUTNÍ MONTÁŽE a WITKOWITZ SLOVAKIA - od mostů po energetiku, kusové dodávky a investiční celky](https://i.ytimg.com/vi/ttUJHQ_FbxA/default.jpg)
![Company Hutní Montáže & Noen](https://i.ytimg.com/vi/QFAGEtJLVMA/default.jpg)
![Company Hutní montáže, a.s. & Noen - Bucket Wheel Excavator KK 1600](https://i.ytimg.com/vi/4PGdg9HJkDs/default.jpg)