Загрузка страницы

POOL CONSTRUCTION 2020: FULL TIME LAPSE + REVEAL

Pool construction summer of 2020.

For construction details and slower time lapse, please watch the full build series in the playlist "Pool construction 2020" on this channel.

After several years we finally decided to build a pool in our garden.

The pool will be a thermopool (isolated concrete pool) of 4 x 8 meters (13 x 26 ft) and 1,5 meters (5 ft) deep with a flat bottom.

A slidable pool roof with clear acrylic windows is placed on top of the pool for safety, cleaning and heating economy reasons. This gives us bathing season between end of March to beginning of November.

Also setups for automation of auto adjustable water level, pH level and Chlorine level are installed. App controlled pool heating air inverter pump. App based management of water quality via a BlueRiiot Blue Connect fitted to pool water return pipe in machine room.

The construction process started in May 2020 and is was concluded in August 2020.

Spring and summer of 2021 will contain pool surroundings furniture, plants, outdoor kitchen, outdoor shower, more lighting and other improvements to the pool area.

The pool is located in Sweden.

#vacationathome

Pool technical concept and construction done by Svenska Pool & Spa in Borås.
Pool and pool area design by myself.

Видео POOL CONSTRUCTION 2020: FULL TIME LAPSE + REVEAL канала Froggle
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
5 января 2021 г. 13:15:56
00:22:19
Яндекс.Метрика