"Struma" highway in Bulgaria - Lot 3.1 (04.12.2022)
Drone video of the construction of the Struma highway Lot 3.1 - near Simitli
Lot 3.1 from Blagoevgrad to Krupnik includes the construction of a motorway from km 359+000 to km 376+000. It is conventionally divided into two sections - section 1 from km 359+000 to km 366+000 /7 km/, and section 2 from km 370+400 to km 376+000 /5.6 km/. Among them, the construction of the "Zheleznitsa" tunnel is planned, which will be implemented by the DZZD "AM Struma tunnel 2018", with participants "GP Group" AD, "Global Construction" OOD and "Via Plan" EOOD, has been selected as the contractor of 2.28 km "Zheleznitsa" tunnel, a tunnel road at the southern portal of the facility and a helicopter pad with 99.96 points, is indicated in the API decision.
Lot 3.1 Blagoevgrad - Krupnik - (12.6 km)
The project includes the construction of two sections and a tunnel
section 1 from km 359+000 to km 366+000 /7 km/
section 2 from km 370+400 to km 376+000 /5.6 km/
"Railway" tunnel: from km 366+000 to km 370+400 /2.6 km/
Total length: 17 km
29 m gauge freeway (without the tunnel)
The price of the tunnel alone is 185,370,370. BGN 37 without VAT.
#blagoevgrad #struma #simitli #bulgaria #greece #skypoint
Video: Struma Highway construction - Lot 3.1
Video Format: 4k
Date: 04.12.2022
Music: Bensound
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is violation of the licence under which this video is available on YouTube platform
Видео "Struma" highway in Bulgaria - Lot 3.1 (04.12.2022) канала skyPoint
Lot 3.1 from Blagoevgrad to Krupnik includes the construction of a motorway from km 359+000 to km 376+000. It is conventionally divided into two sections - section 1 from km 359+000 to km 366+000 /7 km/, and section 2 from km 370+400 to km 376+000 /5.6 km/. Among them, the construction of the "Zheleznitsa" tunnel is planned, which will be implemented by the DZZD "AM Struma tunnel 2018", with participants "GP Group" AD, "Global Construction" OOD and "Via Plan" EOOD, has been selected as the contractor of 2.28 km "Zheleznitsa" tunnel, a tunnel road at the southern portal of the facility and a helicopter pad with 99.96 points, is indicated in the API decision.
Lot 3.1 Blagoevgrad - Krupnik - (12.6 km)
The project includes the construction of two sections and a tunnel
section 1 from km 359+000 to km 366+000 /7 km/
section 2 from km 370+400 to km 376+000 /5.6 km/
"Railway" tunnel: from km 366+000 to km 370+400 /2.6 km/
Total length: 17 km
29 m gauge freeway (without the tunnel)
The price of the tunnel alone is 185,370,370. BGN 37 without VAT.
#blagoevgrad #struma #simitli #bulgaria #greece #skypoint
Video: Struma Highway construction - Lot 3.1
Video Format: 4k
Date: 04.12.2022
Music: Bensound
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is violation of the licence under which this video is available on YouTube platform
Видео "Struma" highway in Bulgaria - Lot 3.1 (04.12.2022) канала skyPoint
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Изграждане на бургаски обходен път (04.04.2023)03.2023 - Разширение на Метро линия 3 в СофияБотевград - Мездра - Лот-2 (08.03.2023)Lot-1 от Ботевград - Видин (08.03.2023)Уникална 360° разходка в тунела към Люлин"Europe" highway in Bulgaria - Lot-1 (24.02.2023)Арена Бургас (21.02.2023)Кукери в Бургас"Europe" highway in Bulgaria - Lot-1 (03.01.2023)Ботевград - Мездра - Лот-2 (15.12.2022)15.12.2022 - Строежът на Ботевград - Мездра - Лот-1Разширение на бул. Ломско шосе в София (02.12.2022)Автомагистрала "Струма" Лот 3.1 - цялото трасе (28.10.2022)10.2022 - Разширение на Метро линия 3 в СофияГотовият Лот-10 на АМ "Хемус" при Шумен - исторически преглед (17.10.2022)Изграждане на бургаски обходен път (10.10.2022)Лютидол - Мездра - Лот-2 (24.09.2022)24.09.2022 - Строежът на Ботевград - Мездра - Лот-1Ремонт на тунела към "Люлин" (02.09.2022)"Europe" highway in Bulgaria - Lot-1