Загрузка страницы

Alba B3 Compression platform for Marathon Oil

The topside for the Alba B3 compression platform was built at HFG’s Zwijndrecht yard and the jackets was constructed at HFG's Vlissingen yard. Iv-Oil & Gas carried out the engineering work at their head office in Papendrecht as well as in Houston, USA.
The bridge, to connect the Alba B3 platform to the existing Alba B2 platform, and the flare were built by the local subcontractor ECG in Malabo. Beginning 2016 the Alba platform was installed by the Thialf in the Gulf of Guinea.

Видео Alba B3 Compression platform for Marathon Oil канала Heerema Fabrication Group
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
27 марта 2017 г. 16:16:04
00:04:45
Яндекс.Метрика