Heads up all - I appreciate the passion, the concern, and some of your observations. This particular crane is NOT the Big Blue that collapsed in Milwaukee. It is a larger crane used in New Haven, CT in 2003. PLEASE keep your comments reasonable and non-confrontational. I don't want to disable comments, because you all have a lot to offer. But it's not fair to anyone to have to read or be the subject of abuse.
Please, have some respect, as you recognize the magnitude of the tragedy that occurred in Milwaukee.
You've heard of the Big Blue collapse...this crane was twice the capacity of the original Big Blue...check it out
The Crane:
3000 Ton Capacity (Rigged for 1500 at 176’ Radius)
51,000 Feet of 1 ½” Cable
56 Parts of Line
6,400,000 Lbs Counterweight
Boom – 2000 Lbs/FT
Mast – 1500 Lbs/FT
100+ Tons Rigging
1044 Ton Total Pick Weight
The Load (Bridge)
343’ Long
60’ Wide
50’ High
880 Tons Steel
27,000 Bolts
18” of Camber Induced for Bolt Alignment
Final set operation:
April, 2003 - CT DOT and Amtrak have arranged a Northeast Corridor track shutdown in New Haven, CT, so this bridge can be placed over the (de-energized) electrified tracks.
4 hour window of opportunity, from midnight to 4 am. This video was taken in pieces during the pick, and then run through a video processor to speed up by 10x. Not high quality, but pretty cool.
My guess is over 1000 onlookers were present...
Ironworkers commented to me afterwards that "it fit like a glove"...
Take a look here:
https://youtu.be/UtwwAv5nvKc
Видео Much Bigger Blue канала Marko Kaar
Please, have some respect, as you recognize the magnitude of the tragedy that occurred in Milwaukee.
You've heard of the Big Blue collapse...this crane was twice the capacity of the original Big Blue...check it out
The Crane:
3000 Ton Capacity (Rigged for 1500 at 176’ Radius)
51,000 Feet of 1 ½” Cable
56 Parts of Line
6,400,000 Lbs Counterweight
Boom – 2000 Lbs/FT
Mast – 1500 Lbs/FT
100+ Tons Rigging
1044 Ton Total Pick Weight
The Load (Bridge)
343’ Long
60’ Wide
50’ High
880 Tons Steel
27,000 Bolts
18” of Camber Induced for Bolt Alignment
Final set operation:
April, 2003 - CT DOT and Amtrak have arranged a Northeast Corridor track shutdown in New Haven, CT, so this bridge can be placed over the (de-energized) electrified tracks.
4 hour window of opportunity, from midnight to 4 am. This video was taken in pieces during the pick, and then run through a video processor to speed up by 10x. Not high quality, but pretty cool.
My guess is over 1000 onlookers were present...
Ironworkers commented to me afterwards that "it fit like a glove"...
Take a look here:
https://youtu.be/UtwwAv5nvKc
Видео Much Bigger Blue канала Marko Kaar
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Towering Crane Helps Replace the FCC at Chevron’s Richmond Refinery5 Largest CRAWLER Cranes In The World!Awesome 5 Cranes in the WorldBig Blue crane collapse at Miller ParkLampson International LTL-30002014 02 06 Eaton Metal Products - Anadarko - Lampson Crane - Video 1080P FINAL 01Lampsons Wiggins Island 2013NASA AFRC DFRC Chiller Crane Lift - Grove GMK6350Crane collapseWorld Amazing Modern Bridge Construct Machines - Latest Technology Construction MachineryThe heavy lifting of Penthouse (200 tons) by Demag CC3800, MKL Bau , Elkem - Straumen Norway3 cranes that collapsed on same day during Irma are same models from same manufacturerSennebogen 5500 crawler crane and wrecking ball, chimney demolitionOmme 2200 Majakan huipulle 132 metriintadano 50 ton diangkat crane sumitomo sa 1100TOP 10 Accidents In Metal Industry ✅dumbass flips a 60ft boom liftSecond Garston bridge removal ( crane set up )Extremely Idiots Excavator Fails & Dangerous Heavy Equipment Driving Compilation !Manitowoc MLC100-1 Assembly Overview