Tower crane #1 rises higher: One-week construction time-lapse with many closeups: Ⓗ Week 32
This week we find out how they raise the tower crane even higher. San Francisco finally sees some rain after going 43 days with no rain (normal for summer but unusual for winter), including the first time in recorded history that there was no rain at all in January, and the storm causes a small amount of damage to the retaining wall covering. And of course there's an assortment of other closeups of concrete pours, excavators, trucks and other construction activity.
I thought last week's time-lapse was long, but this week has so many closeups it even surpassed last week, setting a new record for the longest of the weekly time-lapses so far, with the most closeups. (And consuming a lot of editing time…)
In this "Ⓗ series", we're following the construction of a new 12-story hospital that will occupy an entire city block in San Francisco. This is a construction time-lapse at 900x, with "bonus" highlights/closeups scattered throughout at various speeds. compressing the 6-day period from February 2 - 7, 2015 (Week 32) into about 40 minutes. Most night-times and non-working days are omitted.
This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
Music licensed from AudioMicro.com. I know I'm using the same music for all of these weekly time-lapses, but there's too many of them to license different music for each one. You are of course free to turn down the volume and provide your own accompaniment music!
Видео Tower crane #1 rises higher: One-week construction time-lapse with many closeups: Ⓗ Week 32 канала Hospital Construction
I thought last week's time-lapse was long, but this week has so many closeups it even surpassed last week, setting a new record for the longest of the weekly time-lapses so far, with the most closeups. (And consuming a lot of editing time…)
In this "Ⓗ series", we're following the construction of a new 12-story hospital that will occupy an entire city block in San Francisco. This is a construction time-lapse at 900x, with "bonus" highlights/closeups scattered throughout at various speeds. compressing the 6-day period from February 2 - 7, 2015 (Week 32) into about 40 minutes. Most night-times and non-working days are omitted.
This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
Music licensed from AudioMicro.com. I know I'm using the same music for all of these weekly time-lapses, but there's too many of them to license different music for each one. You are of course free to turn down the volume and provide your own accompaniment music!
Видео Tower crane #1 rises higher: One-week construction time-lapse with many closeups: Ⓗ Week 32 канала Hospital Construction
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
How to build a Tower CraneLiebherr LTM 1300 6.2 built Liebherr tower craneHK Liebherr 630 EC-H 40 Tower Crane (Radio Control) by Cranes Etc TV█▬█ █ ▀█▀ 1400 ton MEGA SCHWERTRANSPORT SPMT auf 64 ACHSEN BAUSTELLE EISENBAHN BRÜCKE DOKU [2]Tower crane #2 rises higher (Ⓗ Week 36 construction clips set #1)Wolff 6023, AarauTwo-week construction time-lapse with 32 closeup clips scattered throughout: Ⓗ Weeks 33 and 34Demontage torenkraan prprojConrad Liebherr 112 EC-H Tower Crane 'Vinci' / 'Van Wellen' by Cranes Etc TVLiebherr - LR 1500 crawler cranePhoenix Tower Chiller Replacement Project by Consolidated Crane & RiggingTower crane #2 rises even higher (from Ⓗ Week 75)Lego Self Erecting Mobile Tower CraneA DAY IN THE LIFE OF A TOWER CRANE OPERATOR / MALAYSIA.kleine kraan afbrekenTower crane top disassembly from a distance with flowing clouds (variable-speed time-lapse)Strictly Cranes dismantles Raimondi luffing LR213 in Sydney suburb2018 08 02 KranaufstellungМонтаж крана 3D