A47 Postwick bridge construction time lapse
The video shows bridge construction by Balfour Beatty (Birse Civils) for Norfolk County Council as part of the A47 Postwick Hub junction improvement.
It is 38 mins long (2.5 min version also available) in four sequences (no sound):
Sequence One. - 14 to 18 April, (18 mins duration). The first view shows the beams being assembled in the compound, the main crane being rigged and (go to 10 mins) on Saturday 18 April the beam pairs being lifted on to the eastern piers.
Sequence Two - 24 and 25 April (go to 18 mins, 11 mins duration). The view shows the A47 closed to traffic, with the arrival and rigging of the main crane (go to 19 mins), arrival of the first beams (go to 23 mins) followed by lifting on to the western piers.
Sequence Three – 9 May (go to 29 mins). A fresh view shows central span beams being lifted into place and the de-rigging of the crane to move to the other side of the bridge for the final two lifts.
Sequence Four – 9 and 10 May (go to 33mins 40 secs). The view moves to the other side of the bridge, showing the crane being rigged and carrying out the final two lifts (the lens is foggy briefly.)
For regular updates on this and other ‘Transport for Norwich’ projects email ‘Transport Matters sign-up’ to norwich.transport@norfolk.gov.uk .
Видео A47 Postwick bridge construction time lapse канала Norfolk County Council
It is 38 mins long (2.5 min version also available) in four sequences (no sound):
Sequence One. - 14 to 18 April, (18 mins duration). The first view shows the beams being assembled in the compound, the main crane being rigged and (go to 10 mins) on Saturday 18 April the beam pairs being lifted on to the eastern piers.
Sequence Two - 24 and 25 April (go to 18 mins, 11 mins duration). The view shows the A47 closed to traffic, with the arrival and rigging of the main crane (go to 19 mins), arrival of the first beams (go to 23 mins) followed by lifting on to the western piers.
Sequence Three – 9 May (go to 29 mins). A fresh view shows central span beams being lifted into place and the de-rigging of the crane to move to the other side of the bridge for the final two lifts.
Sequence Four – 9 and 10 May (go to 33mins 40 secs). The view moves to the other side of the bridge, showing the crane being rigged and carrying out the final two lifts (the lens is foggy briefly.)
For regular updates on this and other ‘Transport for Norwich’ projects email ‘Transport Matters sign-up’ to norwich.transport@norfolk.gov.uk .
Видео A47 Postwick bridge construction time lapse канала Norfolk County Council
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Nashville Public Library timelapsePile Foundation for Bridge ConstructionGebze-Orhangazi-Izmir motorway: Osman Gazi Bridge construction timelapse | World FinanceWolff 6023, AarauRIDE TO THE TOP - Germany's Highest Construction Site | Full DocumentaryIncredible Backyard Transformation Time-Lapse!Timelapse: Xcel Energy's Minnesota Falls Dam Removal ProjectXYZ Rail & Civils - Bishops Grange Bridge ReplacementManchester Airport transformation time lapse Feb 2018World Amazing Modern Bridge Construct Machines - Latest Technology Construction MachineryWetmore Road Bridge DemolitionTimelapse: Bangerter Four InterchangesBRIDGE DEMOLISHED - Morningside BridgeBackyard Transformation Time lapseThis Is How Underwater Structures Are BuiltReverend Jon A Sibley Sr. Underpass Construction TimelapseBarratt Homes Time-Lapse, WarringtonSan Gabriel Trench Construction Time-Lapse (January 2012 - February 2018)Howburn Culvert Time LapseNorway’s $47BN Coastal Highway