Загрузка страницы

Putzmeister: M51-5 Tremie Boom

This training video shows the disassembly of the boom tip section and the assembly of the of a special tip section for truck-mounted concrete pumps type M51-5 and M39-4.

The tremie boom section can be equipped instead of last boom section to increase boom tipload for concreting applications on piling jobsites.
A crane to support the boom is not needed if the boom tip load while using longer end hoses does not exceed the approved load on the tremie section (up to 850 kg possible with M51-5).
SUBSCRIBE:
https://bit.ly/2MiyMnJ

M51-5 PRODUCT INFO:
https://bit.ly/36zGyRG

Putzmeister PRODUCT RANGE:
https://bit.ly/2ORNiVd

FOLLOW US:
Facebook: https://facebook.com/PutzmeisterGroup
Twitter: https://twitter.com/Putzmeister
Instagram: https://instagram.com/Putzmeistergroup
LinkedIn: https://linkedin.com/company/putzmeister-group

Видео Putzmeister: M51-5 Tremie Boom канала Putzmeister
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
7 января 2020 г. 14:09:23
00:02:39
Яндекс.Метрика